Saturated Clay

130422_house looking NW

House and garage excavation. Vibratory roller on garage pad. The green pipes are water line conduits into the understair utility space.

We are still dealing with the effects of a wet spring. Foundation excavation is complete, however our dense clay soils need time to dry out as they are partially saturated. The estimate is another two weeks until it’s dry enough for our sub-slab fill to be compacted sufficiently to pass testing.